Skip to main content

Commercial · Facilities and property managers

A Commercial Roof Priority & Phasing Report

A flat roof leaking in three places, no service history and a capital budget to justify. Start with a phased plan in writing.

Turn a roof that leaks in three places into a phased plan your team can review, approve and budget against.

Ask for the price · Credited toward the first phase awarded within 45 days · Delivered in 3 to 5 business days after the walkthrough.

When this is the right document

Unexplained patches, tenant leak reports, and a choice between another year of patching and a number for the capital plan.

Property managers, owners and facility teams with offices, retail, light industrial, warehouse or multi-family buildings across the DMV.

How this differs from a free estimate

Our estimates are free, but an estimate assumes the scope is settled, and on a commercial roof with several leaks, several sections and no history it rarely is. This report sets the scope and the order of work so the estimate prices the right job.

The report fee is credited toward the first All Purpose Roofers repair or replacement phase awarded within 45 days of delivery. Ask us how the credit applies to your building.

What you get

The deliverable is the Commercial Roof Priority & Phasing Report. Delivered in 3 to 5 business days after the walkthrough.

  • Walkthrough of the accessible roof areas, roof access points and the interior below any reported leak
  • 30 to 75 labeled photos depending on the size of the roof
  • A roof-area map keyed to the photographs, so a finding can be found again by somebody who was not there
  • Membrane or covering type, apparent age, and the condition of seams, terminations, flashings, drains and penetrations
  • Ponding and drainage observations at the accessible areas
  • Written findings organised as Immediate, Near-Term, and Planned
  • Recommended phases, the order to do them in, and what each phase buys you in service life
  • Preliminary budget ranges by phase, for repair, for restoration and for replacement
  • An executive summary written to be forwarded to ownership or facilities leadership without editing

Sizes and price

The size follows the roof area. We do not publish prices. Send the approximate square footage or a site plan and we tell you which applies and what it costs before you are invoiced.

Up to 10,000 square feet of roof area

Ask for the price

10,001 to 40,000 square feet, or multiple roof sections and levels

Ask for the price

The fee comes back if you hire us

The report fee is credited toward the first All Purpose Roofers repair or replacement phase awarded within 45 days of delivery. Ask us how the credit applies to your building.

How it works

  1. 1Send the property details and the approximate roof area, and we confirm the tier before you pay.
  2. 2We invoice and schedule the walkthrough around your operating hours, including evenings and weekends.
  3. 3We walk the accessible roof areas and the interior below any reported leak, and photograph every finding.
  4. 4You receive the written report in 3 to 5 business days.
  5. 5If the first phase is awarded to us within 45 days, the fee is credited against it.

Start your Commercial Roof Priority & Phasing Report

Send the address, rough roof area and any leak log or photos. We confirm the tier, invoice and set a walkthrough time that suits the building. No charge until the report is confirmed as the right fit.

Prefer to talk it through?

(240) 695-4415

The office picks up from 7:00 AM to 7:00 PM daily. Requests left after hours are handled the next morning.

Schedule a Walkthrough
All Purpose Roofers
6965 Heather Drive, Suite A, Bryans Road, MD 20616

We take insurance jobs. Financing may be available for qualifying projects.

What this document is not

  • ·Not an ASTM property condition assessment or an engineering report.
  • ·Not a structural evaluation of the deck, the framing or the load capacity of the roof.
  • ·Not a moisture survey, an infrared scan or a core-cut investigation.
  • ·Not a code-compliance, energy-code or permit review.
  • ·Not something to file with an insurer, and not a ruling on what a policy covers.

Scope limitation: This document is a visual repair-planning report based on accessible conditions observed during the site visit and information provided by the customer. It is not an engineering report, laboratory test, insurance coverage determination, code-compliance certification, structural evaluation, or guarantee that hidden conditions do not exist. Additional work may be required if concealed conditions are discovered after work begins.

Questions about the Commercial Roof Priority & Phasing Report

Is this a property condition assessment?⌄
No. A formal PCA covers building systems in far more depth under professional standards. This is a visual, roof-only condition and phasing document a facilities team can budget from.
What does a larger roof or a portfolio cost?⌄
Multi-site portfolios, warehouses, medical facilities and anything above 40,000 square feet are quoted individually. Send the property list and we will price it.
Do I get the fee back?⌄
It is credited against the first All Purpose Roofers repair or replacement phase awarded within 45 days of delivery. Ask us how it applies to your building.
Do you cut the roof to see what is underneath?⌄
Not in this report. Core cuts, infrared scans and moisture surveys are separate work, and the report says when findings call for them before a replacement is specified.
Can you work around our tenants and operating hours?⌄
Yes. Walkthroughs are booked around occupied space and business hours, including evenings and weekends.