
Roof Replacement in Washington, DC
When a rowhouse flat roof ponds after every rain, or the front mansard is shedding shingles, patching stops paying. We replace rowhouse roofs with the decking rate settled before the old roof comes off.
Replacing a rowhouse roof is mostly a question of access
The hard part of a new DC roof is getting the old one off. A rowhouse has no driveway, no side yard and often no easy way up.
We work that out on the estimate visit, which is the difference between a crew that finishes on schedule and one carrying debris through your hallway for an extra day.
The local problem
The carry down
Without a driveway, old roofing leaves the house one of three ways. It comes down through the house, off the back to the alley, or down a chute into a container on the street.
Older roofs in Shaw, Bloomingdale and around Lincoln Park carry decades of built-up gravel, tar and felt over a plank deck. That is heavy, slow work to move by hand.
A container on a DC street needs a DDOT public space permit, so the plan is set on the estimate visit.
Why DC owners replace instead of patch
A membrane that is mostly patches
When the flat roof has more patches than original surface, a tear-off to the deck is the fix that lasts.
Soft planks under the old roof
Plank decks soak up years of slow leaks. Soft boards are replaced at the per-sheet rate in your written price.
Parapet and party wall edges
Flat roofs fail at these edges. The new membrane runs up the parapet, under the coping, and flashes into the party wall or ties into the neighbor's roof.
Rooftop units and new penetrations
If solar, a new vent or an HVAC unit is going on the roof, flash it in while the roof is new. We work around your other trades.
Rowhouses near Howard University
For rental rowhouses near Howard University and along Georgia Avenue, we can set the date around a move-out.
Historic district replacements
A flat roof behind the parapet usually cannot be seen from the street, and a front mansard can. We tell you which you have before ordering materials.
Roof decks going on top
If a roof deck is in the plans, replace the membrane first so the deck sits on a sound, flashed surface.
The order of a rowhouse replacement
Plan the access
On the estimate visit we decide how debris comes down and material goes up, whether by the hatch, a ladder from the alley or a chute.
Permits lined up
Department of Buildings permit, plus DDOT if a container sits on the street. Historic review only if the work shows from the street.
Strip to the deck
Built-up layers off, soft planks replaced at the set rate, deck readied for the membrane.
Edges first
Parapet and party walls are flashed before the field is finished. Those edges decide whether the roof stays dry.
What a DC roof replacement includes
- Debris plan set on the estimate visit
- Tear-off of built-up layers down to the deck
- Soft planks replaced at the per-sheet rate in the price
- Membrane run up the parapet and under the coping
- Party wall flashing or tie-in, photographed both sides
- Drains, scuppers and penetrations reflashed
- Permit through the Department of Buildings
How our crews get into the city
The Capitol is about 17 miles from our Bryans Road shop, well inside our service area. Trucks take MD 210, I-495 and DC 295 up the Anacostia for Northeast jobs, or cross into the city for Shaw, Lincoln Park and Howard University.
All Purpose Roofers, 6965 Heather Drive, Suite A, Bryans Road, MD 20616. View on Google Maps
Areas served around Washington
Roofing questions from Washington
Do you need a permit to replace a rowhouse roof in DC?
⌄
How does the old roof come off a house with no driveway?
⌄
What happens at the party wall?
⌄
What if the deck under the old roof is rotten?
⌄
How long does a rowhouse roof replacement take?
⌄
Will my neighbor's roof be affected?
⌄
Can a new flat roof be white or reflective?
⌄
Do you replace the front mansard too?
⌄
How much does a full roof replacement cost in Washington DC?
⌄
Roof Replacement near you in Washington, with a free estimate
Or call (240) 695-4415, 7:00 AM to 7:00 PM daily.
We take insurance jobs. Financing may be available for qualifying projects.