
Roof Replacement in Bowie, MD
A Levitt house from the 1960s is usually on its second or third roof, and sometimes both are still up there. We count the layers, check the decking and price repair and replacement in writing.
A new roof on a Levitt house starts in the attic
The vent layout on a 1960s Levitt house was drawn for 1960s expectations, and a hot attic ages shingles from underneath. On these houses the attic can be as much of the problem as the shingles.
With the old roof already off, replacement is the cheap time to fix the ventilation. Skip it and the new shingles bake the same way the old ones did.
The local problem
Heat-aged shingles
Shingles over a hot attic curl, crack and drop granules years before shingles over a cool one.
The vent layout dates from the early 1960s, and insulation added since often blocks the soffit vents. Heat builds up and bakes the roof from inside.
You can check from the ground. Curled edges on the sunny south slope while the north slope lies flat point to heat. Your estimate names the fix, which means soffit vents opened or added and a ridge vent where the roof allows.
When Bowie owners replace instead of repair
Granules in the downspouts
Sandy grit at the bottom of the downspouts means the shingles are shedding their surface. Across the whole roof, patches stop paying.
The second or third roof
Early-section houses are often due for a third roof. If the last went over the old one, both come off, and the layer count is priced up front.
Soft boards under foot
Decking wet for years feels spongy underfoot. Bad sheets are replaced at the per-sheet rate in the estimate.
Buying a Levitt house
Under contract on a Colonial or Country Clubber with a roof near the end? We give you a written replacement price for the seller.
Retiring an old skylight
An aging 1980s or 1990s skylight can be replaced, or framed over and decked, while the roof is off.
Getting the color right for the street
If your HOA approves shingles, the estimate names the product and color for the application.
A roof that failed a home inspection
Sellers often hear about the roof first from the buyer's inspector. A written replacement price lets you negotiate or fix it before closing.
How a Bowie replacement runs
Walk the roof and the attic
Shingles from above, vents and insulation from below. That is how a cooked roof gets spotted.
Count the layers and price the deck
Every layer is tear-off and disposal, every soft sheet has a set rate. Both in writing before you sign.
Paperwork for the county and the association
We pull the county permit when one is needed and give your HOA the product and color.
Tear-off, dry-in, new roof, cleanup
Off to the boards, bad sheets replaced, ice and water shield and underlayment, then shingles, flashing and ridge vent. Nails swept before we leave.
What goes into a Bowie roof replacement
- Full tear-off to the deck, every layer removed
- Decking replaced at the per-sheet rate in the estimate
- Ice and water shield at the eaves and valleys
- Soffit intake and ridge exhaust ventilation
- New flashing at walls, chimneys and vents
- Debris hauled away and nails swept from the yard
- Permit pulled through the county when one is needed
How far Bowie is from our shop
Bowie is about 15 miles from the Capitol, which is what counts for our 30-mile area, and about 29 miles from our Bryans Road shop. Crews take MD 210, I-495 and US 50 past Prince George's Stadium, then MD 197 toward Bowie State University.
Dashed ring: 30 miles from the Capitol.
All Purpose Roofers, 6965 Heather Drive, Suite A, Bryans Road, MD 20616. View on Google Maps
Areas served around Bowie
Roofing questions from Bowie
Who issues the roofing permit in Bowie?
⌄
Why do you talk about the attic when I asked about the roof?
⌄
What happens if the decking is rotten?
⌄
Can I keep my skylight?
⌄
Will a new roof fix my hot upstairs?
⌄
Can you put the new roof over the old one?
⌄
Do you replace roofs on Bowie townhouses too?
⌄
How do you protect my yard and plants?
⌄
Roof Replacement near you in Bowie, with a free estimate
Or call (240) 695-4415, 7:00 AM to 7:00 PM daily.
We take insurance jobs. Financing may be available for qualifying projects.