How long does a replacement take?
For most houses around here it is one to two working days, weather permitting, from the first shingle pulled to the last one nailed.
On a 2,000 square foot house the roof matters more than the floor area. A simple two-slope roof usually fits in those one to two days. A steep roof broken up by dormers takes longer.
The schedule stretches for a steep pitch that needs more safety setup, valleys and skylights to flash, two or three old layers to strip, rotten decking to replace, or a driveway where the dumpster has to sit far from the house.
The weather sets the start date. Nobody should strip a roof with rain on the way, so the date can slide a day or two, and we tell you when it does.
Ask for the start date and the expected number of days in writing with the estimate, so you can plan your week.