What happens during a roof replacement, step by step

By All Purpose Anytime Services LLC

On most houses around DC the crew is on the roof for a day or two, weather permitting. The job starts before that, with the inspection and the written price. Here is the order things happen in.

Before the crew arrives

  • A roofer goes up, takes pictures of every slope, and looks at the underside of the deck from the attic hatch if you have one.
  • Your written price spells out which shingle line, which underlayment, and whether each piece of flashing is new or kept.
  • It also sets what each replacement sheet of plywood costs, in case the old shingles are hiding rot.
  • If you are in an HOA or a planned community, the color and material may need approval first. Get that done before the date is set.

Day one is the tear-off and the deck

The old shingles come off down to the deck, every layer of them. More layers means more labor and more disposal, which is why we count them before we quote.

With the deck bare, soft or delaminated sheathing is found and replaced at the rate you already agreed. If the tear-off shows more damage, we stop and show you before the new sheets go in.

Then the new roof goes on

  • Ice and water shield at the eaves and in the valleys
  • Underlayment over the rest of the deck
  • Drip edge along the edges
  • Flashing at chimneys, walls, vents and skylights
  • Starter course, shingles and ridge
  • Ventilation, so the attic does not cook the new shingles from below

Cleanup and the walk-round

Old shingles go straight into the trailer, and a rolling magnet goes over the lawn, beds and driveway to pick up stray nails.

Then we photograph the finished roof and send you the photos. Your 60 to 90 day warranty starts then, and the estimate already told you which end of that range covers your job.

What can move the schedule

Rain, mostly. Nobody should tear off a roof with rain in the forecast. A steep pitch, extra layers and a roof cut up with lots of details add time. So does access. If a trailer cannot reach the roof line, the debris gets carried, and we check that on the estimate visit so it is in the price from the start.

Living at home through the work

Do I have to leave my house during a roof replacement?

No, most people stay home. Expect a day or two of hammering overhead, and keep children and pets away from the sides of the house where old shingles come down. If the trailer or container needs the driveway, ask where it will go so you can move the cars the night before.

What should I do to prepare my home for a roof replacement?

Clear the driveway and the strip of yard along the walls, and take pictures and mirrors down on the top floor, since the hammering shakes them. If you have an HOA, get the shingle color approved before the date is set. Cover anything stored in the attic, because grit falls through the deck boards during the tear-off.

Plan My Replacement

Send the address and the month you have in mind. The walk-through comes first, then the written price and a date.

We take insurance jobs. Financing may be available for qualifying projects.

Planning a replacement?

Have the roof walked, photographed and priced in writing first.